BCIT
All Gender Changeroom Renovation

 

Client
British Columbia Institute of Technology

Location
555 Seymour Street

Date
April 2024

Duration
5 months

Project Background

Alfred Horie Construction Co. Ltd. delivered the 22-week renovation of the fitness-level changerooms at BCIT’s Downtown Campus (DTC), fully converting the existing washroom and shower facilities into a modern, gender-neutral, accessible washroom and locker area.

The redesign was driven by BCIT’s campus-wide goals of improving safety, accessibility, and inclusion. The previous circuitous layout and poor sightlines were replaced with an open-concept, all-gender locker area featuring separate change, shower, and toilet stalls. Updated gym glazing and signage created a brighter, more vibrant space.

Stakeholder input guided the layout, colours, materials, and functionality throughout — with particular attention to accessibility for users with visual impairments. The scope included selective demolition, complete finishes, new tile and flooring, plumbing upgrades, and coordinated mechanical and electrical work, delivering accessible washroom and shower facilities alongside a refreshed locker area, all in compliance with accessibility standards and current building codes.