A&W Tenant Improvement, Brentwood Mall

A&W Food court TI in the Amazing Brentwood Mall

Client
A&W Food Services of Canada Inc.

Location
1359 Cliveden Ave, Delta, BC

Size
2,800 sq.ft.

Date
Summer 2025

Duration
4 months

Project Background

AHC successfully completed a tenant improvement (TI) project for an A&W restaurant located in the food court at The Amazing Brentwood Mall. The location presented several unique construction challenges: the restaurant was situated on the second floor, directly above an operating retail clothing store, requiring careful coordination to avoid disruption to the tenant below.

The project demanded detailed planning to address a range of logistical and technical constraints, including material deliveries through a busy mall environment, restricted working hours, concrete coring, and mechanical requirements. Despite these challenges, AHC successfully navigated the complexities of the site and delivered an excellent finished result.

Our Solution

Food court TI within a high-traffic, operating shopping mall

Second-floor location directly above an operating retail clothing store

Careful coordination to minimize disruption to adjacent and lower-floor tenants

Logistical constraints: material deliveries and restricted working hours

Technical scope including concrete coring and mechanical requirements

Delivered excellent finished result despite a challenging, constrained site

Ironworkers LOCAL 97, Tenant Improvements

Ironworkers LOCAL 97, Tenant Improvements

Client
Ironworkers Local 97

Location
20135- 115A St, Maple Ridge, BC

Size
6,000 sq.ft.

Date
Summer 2025

Duration
8 months

Project Background

This project involved a two-storey interior addition featuring a multipurpose classroom and meeting room on the first floor, with dedicated office space and a lounge area on the second floor. The addition was designed to provide functional, versatile spaces supporting the organization’s administrative, educational, and meeting needs.

The scope of work included extensive scanning, cutting, and excavation, along with substantial q-decking, rebar, and structural steel installation. Major framing work was completed to accommodate the new design. A key challenge was the concrete pour: AHC brought the concrete truck inside the building to achieve a smooth, efficient pour. The team also removed the old loading bay, leveled the area, installed new asphalt, and transformed it into a new reception area for building users. Typical electrical work included new lighting fixtures, mechanical upgrades were completed, and skylights were added to bring additional natural light to the mezzanine. A full re-roofing of the entire building rounded out the scope.

Our Solution

o Interior renovation
o Extensive scanning, cutting, and excavation works
o Significant structural scope
o Demolition and repurposing of the old loading bay into a new reception area,
o Electrical scope with new lighting fixtures
o Mechanical upgrades, including added skylights for mezzanine lighting
o Full re-roofing of the entire building

A&W Annicas Island, Renovation

A&W Annicas Island, Renovation

Client
A&W Food Services of Canada Inc.

Location
1359 Cliveden Ave, Delta, BC

Size
2,800 sq.ft.

Date
Summer 2025

Duration
4 months

Project Background

Construction included new interior partitions and ceilings, architectural finishes, foodservice areas, millwork and casework, kitchen infrastructure, mechanical and plumbing systems, HVAC modifications, electrical and lighting, equipment rough-ins, and coordination of restaurant-specific fixtures and equipment. Exterior work included modifications to the drive-thru operation, signage and equipment, along with associated site and concrete work at the pickup window and order station.

The scope of work also included new finishes throughout the space, encompassing floor tile, FRP (fiberglass reinforced plastic) wall panels, kitchen equipment, furniture, and updated signage. As GC, AHC coordinated all trades and suppliers to ensure each element aligned with both brands’ operational requirements and design standards, delivering a cohesive dual-branded environment that supports the distinct needs of A&W and Tim Hortons under one roof.

Our Solution

The A&W Annacis Island project involved a comprehensive renovation of an existing Wendy’s/Tim Hortons co-branded restaurant. As the General Contractor under a CCDC2 contract, AHC led the transformation of the space, which involved fully removing the Wendy’s portion of the existing restaurant to accommodate the introduction of A&W, resulting in a newly configured A&W/Tim Hortons dual-branded location. The renovated location features a dual-lane drive-thru and a welcoming patio, enhancing the guest experience and supporting high-volume service for both brands.

The project required close coordination between stakeholders, equipment suppliers, and construction trades to sequence the removal of the former Wendy’s fit-out and the installation of the new A&W elements without compromising the ongoing operations of the Tim Hortons location. AHC’s hands-on role as General Contractor, managing scheduling, trades, and site execution, helped ensure the renovation progressed smoothly, met established schedules, and delivered a fully functional, brand-compliant dual-branded restaurant with a dual-lane drive-thru and inviting patio.

Pret A Manger YVR, Project Management

Pret A Manger YVR, Project Management

Client
A&W Canada

Location
Richmond, BC

Size
3,500 sq.ft.

Date
September 2026

Duration
6 months

Project Background

Working in a live, high-traffic international terminal, AHC successfully delivered project management and logistical support for three PRET projects at Vancouver International Airport (YVR), spanning Pier A/B, Pier C, and Pier D, including the first standalone Pret location in B.C. and the first at a Canadian airport. Providing ongoing logistical and coordination support across all three project locations, AHC helped ensure activities progressed in line with established schedules. The team coordinated multiple vendors, equipment suppliers, and stakeholders to ensure the timely delivery, distribution, and availability of all required equipment and materials.
These projects demanded tight coordination between construction activities, vendor deliveries, and airport operations, all while maintaining safety and minimizing disruption to travellers and tenants. AHC’s role in managing equipment logistics and multi-stakeholder coordination was instrumental in keeping each project on track and seamlessly integrated into the active terminal environment.

Our Solution

o Vendor Coordination: Liaising with multiple vendors, contractors, and project teams to coordinate schedules, deliveries, and project requirements.
o Equipment Scheduling: Managing equipment schedules to align with project timelines, installation requirements, and the needs of various work groups.
o Receiving and Inventory Management: Receiving the majority of project equipment at AHC’s shop, coordinating incoming deliveries, and managing equipment storage and organization.
o Equipment Distribution: Organizing and distributing equipment from AHC’s shop to the designated project locations as required, ensuring each team had the necessary resources to maintain its work schedule.
o Logistics and Communication: Coordinating equipment movements, delivery timing, and communication between vendors and multiple project groups to minimize delays and maintain workflow efficiency.
o Project Support: Providing ongoing logistical and coordination support across all three project locations to help ensure activities progressed according to established schedules.

YMCA Robert Lee Steam Room Renovation

YMCA Robert Lee Steam Room Renovation

Client
YMCA Robert Lee

Location
955 Burrard St, Vancouver, BC V6E 0B1

Size
3,150 sq. ft

Date
October 2024

Project Background

This project involved the renovation of the steam room at the YMCA Robert Lee facility, requiring specialized installation methods and detailed coordination to achieve a high-quality finished space.
The scope included complex curved wall construction and the installation of a Schluter waterproofing and tile system, requiring precise detailing and workmanship to accommodate the unique geometry and performance requirements of a steam room environment. Successful execution required close coordination among multiple trades and project stakeholders to ensure proper integration of the specialized systems, maintain quality standards, and deliver a durable, watertight finish.

Our Solution

o Multi-Trade Coordination — integrated demolition, finishes, plumbing, mechanical, and electrical scope
o Occupied Facility Renovation — work performed in a live campus environment with ongoing operations
o Complex Finishes – curved walls, integrated lighting, new Schluter system
o Nonprofit Community Organization
o General Contractor

Bonsor Recreational Complex Re-Roof

CoB Bonsor Recreational Complex Re-Roof

Client
City of Burnaby

Location
6550 Bonsor Ave, Burnaby, BC V5H 4P6

Size
10,850 sq.ft.

Date
March 2025

Duration
4 months

Project Background

The Bonsor Complex Re-Roofing project involves the complete removal of the existing roof, benches, and organic/irrigation systems, followed by installation of a new, durable roofing system. The scope includes necessary concrete repairs to ensure structural integrity and construction of new stairs for improved accessibility and safety. The project will enhance the building’s weatherproofing, longevity, and functionality while adhering to all local building codes and regulations.

Construction is completed while the Bonsor Complex remains fully operational, with emergency egress maintained throughout.

Our Solution

Full roof replacement, including removal of existing roof, benches, and organic/irrigation systems

Structural concrete repairs to ensure integrity and longevity

New stairs for improved accessibility and safety

Enhanced weatherproofing and functionality, fully code-compliant

Completed while the facility remained fully operational, with emergency egress maintained

JD Sports Tenant Improvements

JD Sports Robson Street Flagship Store TI

Client
JD Sports

Location
1034 Robson St, Vancouver, BC

Size
Building addition – 1,700 sq.ft.

TI renovation – 14,300 sq.ft.

Date
June 2025

Duration
12 months

Project Background

As Construction Manager, AHC successfully delivered a building addition (1,700 sq ft) and TI renovation (14,300 sq ft) for JD Sports’ first Canadian flagship, a landmark store on Vancouver’s Robson Street and the company’s first street-front location in the country.

The scope of work included structural expansion, full interior buildout, and extensive mechanical and electrical system upgrades tailored for a high-traffic retail environment. Key features included a modernized open retail floor plan, integrated lighting and electrical systems to support advanced merchandising displays, and upgraded mechanical systems designed for energy efficiency and occupant comfort.

Designed to engage and inspire, the space delivers an immersive retail experience — from its double-height shopfront and digital portal entrance to signature shop-in-shops for Nike, New Balance, and Adidas, and a high-energy atmosphere supported by upgraded sound and digital systems throughout. AHC coordinated all phases of construction to align with the client’s branding vision, while ensuring quality, durability, and code compliance throughout the project.

Delivered as part of JD Sports’ broader North American growth strategy (with 17 additional Canadian stores planned by the end of 2026) the flagship stands as a testament to what coordinated, brand-aligned construction management can achieve.

Our Solution

Flagship-caliber delivery — a landmark store executed to demanding brand standards in a premier shopping destination.

Multi-discipline coordination — structural, mechanical, electrical, lighting, and digital systems integrated under one team.

Brand-aligned construction — every phase coordinated to match JD Sports’ vision without compromising quality or code compliance.

Deer Lake Road Improvement

Deer Lake Road Improvement - Chase Gray, xʷəlməxʷ Embrace

Client
City of Burnaby

Location
Deer Lake Park, Burnaby, BC

Date
April 2025

Project Background

Alfred Horie Construction Co. Ltd. proudly completed a City of Burnaby Public Art Collection project featuring a Coast Salish design by Chase Gray, repeated along the pathway stretching between the Burnaby Art Gallery and Deer Lake. The design is sandblasted along the full length of the walking path, incorporating infrastructure elements such as manholes.

AHC created custom stencils from specialty materials engineered to withstand the sandblasting process, then successfully sandblasted the area to reproduce the Coast Salish design along the full path length, carefully working around and integrating existing infrastructure such as manholes into the finished artwork.

The work also included coordination of existing underground services, requiring AHC to expose and verify the locations and elevations of all existing services prior to construction. Existing lawn drains in the grasscrete were removed, perforated pipes flushed, and grate elevations adjusted to accommodate the new concrete walkway, with barrels replaced and grates and perforated drains retained. Grates were adjusted to 30 mm below finished grade in regraded areas, with concrete troweled for a smooth transition to the lawn basin.

About the Design

The design motif follows the longstanding tradition of goat horn carving among xʷməθkʷəy̓əm (Musqueam) people where the carved horns may be worn as bracelets. Once intimately wrapped around the wrists of people, now etched into the lands at Deer Lake Park as a marker of presence in the territory. 

Chase Gray is a queer artist from Musqueam (Vancouver) and Tsimshian. Born in Nanaimo and raised on the mainland, Gray is of Musqueam and Tsimshian descent from his mother and of unknown European setter descent from his father. Gray considers himself non-binary but generally uses he/him pronouns. His work considers identity and contemporary culture, reflecting the breadth and complexity of his heritage.

On Photo:  Kseniia Zuieva, AHC Project Manager;  Isabel Londono, City of Burnaby Engineer Project Management; Mindi Wang & Judy Stoyko, Judy Stoyko Landscape Architecture 

Coastal Church New Westminster Renovation

Coastal Church New Westminster Renovation

Client
Coastal Church

Location
403 E Columbia St, New Westminster, BC V3L 1A9

Date
403 E Columbia St, New Westminster, BC V3L 1A9

Project Background

Alfred Horie Construction Co. Ltd. delivered an interior renovation refresh at Coastal Church in New Westminster, working closely with the church and campus pastor Payam Jalali to provide this upgrade.

Located in a historic building, the project refreshed the Sanctuary, multipurpose room, washrooms, and hallway, with fresh paint, new flooring, new plumbing and lighting fixtures, safe railings, and other targeted improvements throughout.

Our Solution

The work was completed on budget and just in time for Coastal Church’s 2024 Christmas Eve service in the refurbished New Westminster sanctuary.

McDonald’s Barnet Hwy Renovation


McDonald’s Barnet Renovation

Client
McDonald’s Restaurants of Canada Limited

Location
Barnet Hwy, Coquitlam, BC

Date
August 2024

Duration
6 weeks

Project Background

AHC completed a renovation for a McDonald’s Restaurants location on Barnet Highway. The approximately 8,000-square-foot project involved a comprehensive interior update to the restaurant’s vestibule, 122-seat dining area, service area, presenter booth, public washrooms, manager’s office, and crew room, along with a kitchen expansion to accommodate increased order volumes. Notably, this is the first McDonald’s location in British Columbia to feature the new “A Touch of Archery” interior design package, which enhances both functionality and aesthetic appeal.